VDOT News - Hampton Roads

RELEASE:

CONTACT:
IMMEDIATE

Hampton Roads Public Affairs 757-956-3032
[email protected]

HRO-206208

Oct. 20, 2023



HAMPTON ROADS WEEKLY LANE CLOSURES REPORT OCTOBER 22-28
Closures on Water Crossings, Interstates, and Other Notable Detours

NOTE: This list covers full closures of interstates, ramps, bridges and primary roads, and lane closures at the bridge-tunnels and the Berkley, Coleman, High Rise and James River bridges.
*Scheduled closures are subject to change based on weather conditions and other factors.*
For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511.

Bridges and Tunnels:

Hampton Roads Bridge-Tunnel, I-64:

  • Mobile, single-lane closure westbound Oct. 26 from 9 p.m. to 5 a.m.

Monitor-Merrimac Memorial Bridge-Tunnel, I-664:

  • Alternating, mobile, single-lane closures northbound Oct. 22-26 from 9 p.m. to 5 a.m.

Berkley Bridge, I-264:

  • Alternating, mobile, single-lane closures westbound Oct. 21-22 from 6-10 a.m.
  • Alternating, mobile, single-lane closures westbound Oct. 25 from 9 a.m. to 2 p.m.
  • Double-lane closures westbound Oct. 26 from 7 p.m. to 5 a.m.

James River Bridge, Route 17:

  • Mobile, single-lane closures in both directions Oct. 23 from 9 a.m. to 2:30 p.m.

HRBT Expansion Project:

  • For lane closures and project updates related to the HRBT Expansion Project, visit HRBTExpansion.org.

Elizabeth River Tunnels (Downtown/Midtown Tunnels):

  • Go to Elizabeth River Tunnels for maintenance schedules on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164).

I-64, Southside Widening, High Rise Bridge Expansion:

I-64, Hampton Roads Express Lanes:

Hampton:

  • Full closure of the on-ramp from Settlers Landing Road/Woodland Road to I-64 east Oct. 22-24 from 9 p.m. to 5 a.m. View the full traffic alert here.
  • Long-term, continuous single-lane closure on I-64 in both directions, reducing travel lanes from three to two lanes between Settlers Landing Road/Woodland Road (exit 267) and LaSalle Avenue (exit 265), with I-64 west traffic shifted to the I-64 east lanes. View the full traffic alert here.

Norfolk, Reversible Roadway:

  • Full closure in both directions:
                - Oct. 23-25 from 9:30 a.m. to 12:30 p.m.
                - Oct. 26-27 from 8 p.m. to 3 a.m.

I-95, Prince George County/Sussex County:

  • Full closure of I-95 south between Route 301/South Crater Road/Carson (exit 37) and Route 40/Stony Creek/Waverly (exit 31) Oct. 24 from 6 p.m. to 7 a.m. View the full traffic alert here.
  • Full closure of the on- and off-ramps to/from I-95 south and Route 602/Cabin Point Road (exit 33) Oct. 24 from 6 p.m. to 7 a.m. 
  • Full closure of I-95 south between Route 40/Stony Creek/Waverly (exit 31) and Route 645/Owen Road (exit 24) Oct. 25-28 from 6 p.m. to 7 a.m.

I-95, Greensville County:

  • Full closure of the I-95 south ramp to/from Moores Ferry Road (exit 4) Oct. 25-26 from 9 a.m. to 4 p.m.

Other Notable Closures:

Route 17, York County:

  • Brief, intermittent stoppages on Route 17 in both directions between Matthews Street to Goosley Road Oct. 23-26 from 7 p.m. to 5 a.m.

(END)



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: Oct. 20, 2023