VDOT News - Hampton Roads

RELEASE:

CONTACT:
IMMEDIATE

Hampton Roads Public Information 757-956-3032
[email protected]

HRO-204839

July 28, 2023



HAMPTON ROADS WEEKLY LANE CLOSURES REPORT JULY 30 TO AUGUST 5
Closures on Water Crossings, Interstates, and Other Notable Detours

NOTE: This list covers full closures of interstates, ramps, bridges and primary roads, and lane closures at the bridge-tunnels and the Berkley, Coleman, High Rise and James River bridges. 

*Scheduled closures are subject to change based on weather conditions and other factors.* 

For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511. 

Hampton Roads Bridge-Tunnel, I-64: 

  • Alternating, mobile, single-lane closures in both directions July 31 to Aug. 2 from 9 p.m. to 5 a.m. 
  • Single-lane closures eastbound Aug. 1-3 from 9 p.m. to 5 a.m. 

Monitor-Merrimac Memorial Bridge-Tunnel, I-664: 

  • Alternating, mobile, single-lane closures in both directions July 31 to Aug. 1 from 9 p.m. to 5 a.m. 
  • Alternating, mobile, single-lane closures southbound Aug. 1 from 9 a.m. to 2 p.m. 

High Rise Bridge, I-64: 

  • Brief, intermittent stoppages eastbound Aug. 1 from 11 p.m. to 1 a.m. 

Berkley Bridge, I-264: 

  • Single-lane closure eastbound July 31 to Aug. 1 from 7 p.m. to 5 a.m. 
  • Alternating, single-lane closures westbound July 31 to Aug. 1 from 7 p.m. to as late as 5 a.m. 
  • Double-lane closures eastbound as early as 8 p.m., with full closure of all eastbound lanes from 10 p.m. to 5 a.m. July 31 to Aug. 3. 
  • Single-lane closure on I-464 northbound July 31 to Aug. 3 from 8 p.m. to 5 a.m. 

James River Bridge, Route 17: 

  • Alternating, mobile, single-lane closures in both directions Aug. 2 from 9 p.m. to 5 a.m.

George P. Coleman Bridge, Route 17: 

  • Alternating, single-lane closures in both directions July 31 to Aug. 4 from 9 a.m. to 3 p.m. 

HRBT Expansion Project:

  • For lane closures and project updates related to the HRBT Expansion Project, visit HRBTExpansion.org.

Elizabeth River Tunnels (Downtown/Midtown Tunnels): 

  • Go to Elizabeth River Tunnels for maintenance schedules on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164).

I-64, Southside Widening, High Rise Bridge Expansion:

I-64, Hampton Roads Express Lanes:  

Hampton: 

  • Long-term, continuous single-lane closure on I-64 east, reducing travel lanes from three to two lanes between Settlers Landing Road (exit 267) and Rip Rap Road. View the full traffic alert here.  
  • Long-term, continuous single-lane closure on I-64 west, reducing travel lanes from three to two lanes between Woodland Road (exit 267) and Rip Rap Road. View the full traffic alert here.  

Norfolk, Reversible Roadway:

  • Full closure in both directions July 30 to Aug. 3 from 8 p.m. to 3 a.m. 

I-264, Norfolk: 

  • Full closure of the off-ramp from I-264 east to Saint Paul's Boulevard July 31 to Aug. 3 from 10 p.m. to 5 a.m. 

I-664, Chesapeake: 

  • Brief, intermittent stoppages on I-664 south near Route 58 (exit 13) July 31 to Aug. 4 from 9 p.m. to 5 a.m. 

I-664, Newport News: 

  • Full closure of the on-ramp from 25th Street to I-664 north Aug. 2-3 from 10 p.m. to 5 a.m.

(END)



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: July 28, 2023